Products / GPU Cloud

GPU compute without building the infrastructure.

Run training, fine-tuning, and inference on NVIDIA GPU instances or bare metal GPU servers. Choose flexible terms or reserve capacity for an agreed period.

Access
GPU instances or bare metal GPU servers
Commercial terms
Flexible or reserved capacity
Workloads
Training, fine-tuning, inference, research
Grows into
Dedicated AI Clusters

Access options

Instances or bare metal.

The difference is how much of the server your team controls. Commercial terms are a separate choice.

Access and commitment
GPU InstancesA virtualized share of a serverBare Metal GPU ServersThe whole server: your OS, drivers, runtimeYour OS · drivers · runtimeCommercial terms apply to either optionReserved capacity: quantity, configuration, term, start dateExpansion

Access option

GPU Instances

Virtualized GPU environments with a chosen GPU allocation, CPU, memory, storage, and software image. Start working without managing hardware.

You control
Software image, frameworks, jobs
Best for
Development, experiments, variable demand

Access option

Bare Metal GPU Servers

Dedicated physical servers with no virtualization layer. Your team controls the operating system, drivers, and runtime on the whole host.

You control
OS, drivers, runtime, full host
Best for
Sustained training, performance-sensitive inference

Commercial terms

Reserve capacity on either access option.

Reserved capacity is a commercial commitment to an agreed quantity, configuration, term, and start date. We plan delivery and expansion around your expected usage. Flexible terms suit work that is still taking shape.

Deployment options and terms

NVIDIA systems

Server-scale or rack-scale.

GPU count, NVLink domain size, memory, and facility requirements belong in the same decision. We help you match them to your model and workload.

Blackwell Ultra · Server

NVIDIA HGX B300

8 GPUsper server

A server-scale building block. Clusters connect many of these servers over an InfiniBand or Ethernet network.

Architecture
Blackwell Ultra
Form
Server-scale, 8 GPUs
Scale-up
5th-gen NVLink, 8-GPU domain

Grace Blackwell Ultra · Rack

NVIDIA GB300 NVL72

72 GPUs36 Grace CPUs per rack

All 72 GPUs share one NVLink domain, which suits large models and reasoning inference.

Architecture
Blackwell Ultra
Form
Rack-scale, liquid-cooled
Scale-up
5th-gen NVLink, 72-GPU domain

Vera Rubin · Rack · Next generation

NVIDIA Vera Rubin NVL72

72 GPUs36 Vera CPUs per rack

NVIDIA’s next-generation rack-scale platform for large-scale pretraining, post-training, and agentic inference. We plan deployments with customers as availability is confirmed.

Architecture
Rubin
Form
Rack-scale
Scale-up
6th-gen NVLink, 72-GPU domain
GPUCPU

System names refer to NVIDIA platform families. Configuration, quantity, and delivery timing are confirmed for each engagement.

SystemArchitecture and formTypical fit
NVIDIA HGX B300Blackwell Ultra; 8 GPUs per server connected by fifth-generation NVLinkModular servers for training, fine-tuning, inference, and scale-out clusters
NVIDIA GB300 NVL72Blackwell Ultra; 72 GPUs and 36 Grace CPUs in one fully liquid-cooled rackLarge models and reasoning inference that benefit from a 72-GPU NVLink domain
NVIDIA Vera Rubin NVL72Rubin (next generation); 72 GPUs and 36 Vera CPUs per rack with sixth-generation NVLinkLarge-scale pretraining, post-training, and agentic inference; we plan deployments with customers as availability is confirmed

Running on Hopper today? We can plan H100 and H200 configurations as part of a migration or expansion.

Configuration

More than a GPU count.

Many performance problems on rented GPUs start somewhere other than the GPU, so we size the whole server.

GPU memory

Sized to model weights, activations, precision, context length, and batch size.

Host CPU and RAM

Enough headroom for data loading and preprocessing so GPUs aren’t left waiting.

Networking and storage

Matched to how your jobs read datasets and write checkpoints.

Software and support

Images, drivers, frameworks, access, and monitoring agreed before you start.

When jobs outgrow individual servers, move to a dedicated multi-node cluster.

Plan compute around real usage.

Bring your model, job profile, expected duration, and target start date. We’ll recommend a system, an access option, and terms.

or email contact@arccloudai.com